4WD Logo 4WD Wagon
 Matt & Kym O'Brien
 

Home

Projects

Project 2

Project 3
Page 1
Page 2

Off Road Racing

Sponsors Of

Big Boys Toys
Project 1

GU Short wheel base Nissan Patrol.

Image 5.
Image 5. Click to enlarge.

Off to the panel shop.

The body has been lifted off the chassis so the hard work can begin.

Any damaged panels have been removed, replaced or repaired. All the panels line up and its now ready for the next step.

Image 6.
Image 6. Click to enlarge.

In between jobs.

While the body is off the chassis it's time for all of the small jobs to take place.

Fuel lines are changed, wiring looms are removed and everything is prepared for the motor conversion.

Image 7.
Image 7. Click to enlarge.

Extreme make over??!!

Put the powder puffs and the frilly dresses away, its time for a manly make over!

While the body is off, the chassis goes in for significant modifications. Some of these include; modified trailing arms, A arms in the rear and pneumatic bump stops in the front.

 

Image 8.
Image 8. Click to enlarge.

Matt's crash diet.

In preparation for racing anything that is not required is removed to make way for the go fast bits.

The standard seats, seat belts, console and luxury items are put aside to make way for racing buckets, harness's, the necessary gauges and a roll cage.

Anything else is just dead weight!

Previous - Page 2 - Next